Skip to main content
Home
Stop Solar Farms
Working to fight the invasion of Industrial Solar Farms destroying land and lives.
  • Login
  • Home
  • Contact us
  • FORUM
  • Environment
    • EPA
    • Solar Farms Threaten Birds
  • Exposing Lies
    • Power Systems Engineer With 60+ Years Experience Exposes Solar and Wind Myth
    • Solar’s dirty secrets
  • Financial
    • Sunshine might be free but solar is not cheap
  • Fires
  • Hazardous Materials
  • Health
  • Miscellaneous
  • Security
  • Legal
    • Criminal Cases
    • Lawsuits
      • AL Lawsuits
      • FL Lawsuits
      • ID Lawsuits
      • IL Lawsuits
      • MA Lawsuits
    • Regulations
      • Documentation
        • Miscellaneous Docs
        • CA Docs
        • NY Docs
          • Duanesburg NY Regs
        • WI Docs
      • Regulation News
        • FL News
        • IN News
          • Pulaski County
        • ME News
        • MO News
        • NY News
          • Gloversville
          • Moreau
          • Niagara County
        • OR News
        • RI News
        • VA News
  • Politicians
    • IN Officials
      • State Officials
    • PA Officials
      • State Officials
  • Links
  • SEARCH
  • About Us
  • Stop Solar and Wind Yard Signs Available
  1. Home

Solar farm proposed for toxic Southeast Side industrial site

Thu, 12/31/2020 - 9:40am by Anonymous

The Cook County Land Bank is in talks to lease land for up to 35 years on part of the massive former Acme coke operation.

A portion of a massive toxic industrial site on the Southeast Side is being considered for a future home to a solar farm.
The Cook County Land Bank Authority has taken title to land near East 114th Street and South Torrence Avenue, clearing the property’s back taxes in hopes of drawing a solar operation on about 36 acres, a spokesman said Tuesday.

The property is part of a sprawling former site of the former Acme coke operation, which has been dormant for years. The land bank wants to lease the land to California solar company SunPower for up to 35 years. A lease-option agreement is being drafted, and the company will have two years to decide if it wants to enter into a long-term lease.
 

To read the entire article, click Solar farm toxic SE side Industrial Site

Environment
  • Log in to post comments
Powered by Backdrop CMS